Loading

Category Archives: Completed Project

Image

MedExpress Longmont

13th OF April

We are excited to be working with MedExpress for the second time.   This time the project is located in Longmont, Colorado.  The building was originally a bank and...

Image

MedExpress Fort Collins

01st OF August

MedExpress is an urgent care clinic that is located on the corner of College Ave. and Boardwalk Dr. The existing 3,900 square foot building received a complete renovation including...

Toppers Pizza Greeley

12th OF July

Located in Greeley, Colorado Toppers Pizza and is being built in a core and shell space that is approximately 1,625 square feet.  With the space being previously unoccupied all...

Image

CDOT Morrison Sand Shed

30th OF May

Constructing a new 4,000 square foot pre-engineered metal building, paving new asphalt, and creating a storm water management infiltration basin for CDOT. More Photos

Image

Diamond Vogel Tenant Finish

23rd OF March

Tenant finish work to improve the space including the back shop area.

Image

Massage Heights Front Range Village

08th OF March

New tenant finish build for a locally owned and operated business. View the completed project.

Image

CGRS

01st OF January

Along with the additional office space that is needed, the electrical was upgraded. Check out more about this project

Image

East Coast Pizza

21st OF October

For this project, we converted and combined a retail space and white box into a pizza restaurant. By combining the two… East Coast Pizza

Image

Corner Store Truck Stop

31st OF August

Demolished an existing convenience store and fuel systems to replace with a new facility and system.  Check out more about this project

Image

Otto Pint

10th OF April

Converted a gas station into a bar and pizza restaurant with open ceilings, exposed duct work, and vinyl flooring. Check out more about this project